What the client wanted
After looking through a few of our other case studies, the team knew that they loved our work. they wanted something similar to the SCM Group Nottingham project that we completed not too long ago. This came with a light and airy feel that made sure that the washroom felt open and breathable. In doing this, we’re able to achieve a clean atmosphere that adds the perception of extra space even in the smallest of spaces.
Pairing this with beautiful oak effect doors and some darker accent pieces dotted around the washrooms too, we were able to get a real feel for what they wanted right off the bat. It was really exciting to have a client that knew exactly what they were after because we could deliver exactly that for them and see their reactions when getting it right. The more minor details like fixture styles and fittings were something that they left up to us as they didn’t really have preferences on these.
So, with all of that in mind, we got to work, started designing their perfect school toilet and made sure that everything we did cover the whole scope of the project so that everything they needed was within budget.
What we achieved
After the design work had been completed and signed off by the client we could move on to the next stage! This is one of the best parts of a project because this is the point at which everything starts to come together and our designs start to take shape.
Our washroom fitting team took to space and removed all of the old, tired interiors. We could then make sure that the space was ready for our new upgrades to go in without any snags or issues. Preparation is a key part of any washroom fit out because if you set up properly, you end up mitigating potential issues or finding anything that it’s quite right before the real work begins. That’s why we visit your washroom before giving you a full quotation so that we’re able to fully scope out the work that you’d need us to help you with, which is what we did here.
The finished result looks amazing and we couldn’t be happier with it. The sleek, dark accents really tie the space together as they create complementary contrasts with the light oak effect doors and white walls. The bright LED lighting ensures that everything is lit up and safe for anyone within the space which is a big priority in a school.
Key Solutions Included
- Safely flooring
- PVC cladding
- Compact-grade laminate cubicles
- Bespoke vanity units
- IPS (integrated panel systems)
- Shower cubicles
- Electrical (lighting)
- Painting
- Push-button taps
- Plumbing